Projects

  • LVMA Project Philippines Custom Manual Transfer Switch Cabinet

    LVMA Project | Philippines Custom Manual Transfer Switch Cabinet

    Lvma-ele on 26-07-13

    Power grid instability including frequent grid outages, voltage dips and temporary supply interruptions is a widespread issue across the Philippines, affecting commercial retail outlets, light manufacturing workshops, small warehouses and [...]

  • LVMA Project Philippines Custom Manual Transfer Switch Cabinet

    LVMA Project | Philippines Custom Electric Power Distribution Box

    Lvma-ele on 26-07-13

    Philippines has widespread commercial buildings, light manufacturing workshops, retail stores and small industrial facilities. Local power grids feature fluctuating grid voltage, frequent short‑term power surges, plus strict site electrical safety [...]

  • lvma project-Main Distribution Panel

    LVMA Project | Philippines 600A Customized Main Distribution Panel

    Lvma-ele on 26-07-11

    The client is a local EPC contractor in the Philippines undertaking the construction of mid-rise commercial buildings in Metro Manila. Reliable power is needed to power the building. The project [...]

  • LVMA Project Philippines 1250A Automatic Transfer Switch ODM (3)

    LVMA Project | Philippines 1250A Automatic Transfer Switch ODM

    Lvma-ele on 26-07-02

    The Philippines frequently faces unstable grid power, frequent blackouts, voltage fluctuations caused by typhoons and peak electricity demand. For large-scale factories, shopping malls, data centers, hospitals and commercial complexes, sudden [...]

  • Thailand Automatic Transfer Switch Cabinet

    LVMA Project | Thailand Automatic Transfer Switch Cabinet

    Lvma-ele on 26-06-26

    LVMA newly finished 400A 4P ATS automatic transfer switch distribution boxes are in stock for worldwide delivery. Complete with volt/amp meters, intelligent controller, safe dual power switching for generator, commercial [...]

  • image-5

    LVMA Project | South Africa 36kw SF6 Gas Insulated Cabinet

    Lvma-ele on 26-06-26

    This project case comes from a 120,000 square meter comprehensive manufacturing industrial park in South Africa, which is the core production base for food processing, packaging machinery and cold storage [...]